START-UP AND CHECK OUT
1. Turn the cubers power switch to the clean (pump only) position. The water pump only should be operation-
al. Check for an even, steady flow of water over the evaporator top extrusion and down over evaporator
surface. Check that all ports of the water distribution tube are open for even water discharge. The water
pan should refill and the float should stop the incoming water supply.
2. Place the cuber’s power switch in ON position. After a 2 second delay the compressor will start. The con-
denser fan will operate when the condenser sensor signals the circuit board that its temperature is 100
(38_ C). The water pump will operate when the evaporator cools to 25_F (3.9_ C). Depress the manual
harvest switch located on the circuit board. The fan motor will stop and the water dump valve will open. in
3 seconds the hot gas solenoid will open and 15 seconds after depressing the manual harvest switch, the
water pump will stop and the dump valve will close terminating the dump cycle.
3. Hold the ice harvest switch open for a maximum of 30 seconds; the product should shut down. Release the
ice harvest switch. When the switch closes, there will be a 2 second delay, and the compressor will start
and the start-up process should begin for the next ice making mode.
4. If all product operation are as stated, allow product to operate and product one slab of ice, then discard the
ice. Allow the product to continue operation to fill the storage bin.
POWER SWITCH
DUMP
VALVE
ON
OFF
CLEAN
FIGURE 4. ELECTRICAL BOX SWITCH PANEL